5

Raw Block

Raw concrete block is made up of 2 concrete slabs on both sides and strongly helded by 2 galvanized iron bars inside. These two iron bars are for the function of keeping the block structure firmly they are also the iron frame system for the block-built wall, combined with the vertical iron system installed at the same time creates a perfected iron frame ready for concrete pouring. The grooves are made on top and bottom of concrete slabs will interlock blocks themselves in installation progress creates a solid structure. Raw concrete block is suitable for the following applications:
  • Steps and stairs
  • Pillars & Column’s
  • Fire Pits
  • Garden beds
  • Landscape features
  • Underground tanks
  • Letterboxes
  • Retaining walls
  • Basement and exterior walls
  • Common dividing walls and boundary walls
  • Swimming pool construction
  • Fencing
  • And many more uses
You are a skilled person and you want to do some items for your own home yoursefl without to go through too many steps, spend a lot of time and money; You are a builder or housing developer, you want to save your costs, your time, human energy, bring new construction method experience and value to your customers, raw concrete block can help you to do this because it also has the following outstanding features:
 
  • Easy installation, lego concept
  • Interlocking system
  • Rapid construction
  • Much faster than traditional constuction methods
  • Significantly reduces mess on site
 
HOW TO INSTALL
 
Building with PRIZEBLOCK is so easy and simply, so no matter what you use PRIZEBLOCK for, just go through these 4 steps bellow:

Step 1: Make and level the foundation
Make the foudation solid and level it before laying the block. Depend on what is the application the foudation may needs concrete prefilled to well sticking with 1st layer of block

Step 2: Lay the blocks
Lay the first layer of blocks onto the foudation, make sure there is a perfect line, square angle and the block are level to ensure vertical alignment. Continue to lay the second layer on top of the first layer in brick to desired height.

Note that if the height of your project is higher than 6 layers of block, you need a vertical iron frame in the internal of blocks and this vertical iron must be tired with the iron bars already available in the blocks to form a solid iron system before pouring concrete motar.

Step 3: Fill concrete or sealant
Fill concrete grout into the internal of the block if desired height is more than three blocks tall or apply the sealant on two roughs of the blocks if the project height is not higher than three block layers .

Step 4: Install the cap
Most of application is ended with the matched color cap on top. The caps must be in a straight line, correct position and in line with the adjacent caps